Contractor estimates that close, not collect dust

Send a professional, itemized estimate from the job site. Homeowner approves, signs, and pays the deposit from their couch — before they call another GC.

No credit card required.

6–8 jobs
Managed simultaneously in one dashboard without a spreadsheet
100%
Of change orders with a signed approval before work starts
< 2 hrs
From walkthrough to estimate link in the customer's inbox

What slows general contractors down today

You spend two hours writing a detailed scope and the customer wants a 10% discount because they got a cheaper quote.

Change orders happen on every job. Verbal agreements turn into payment disputes at the end.

Chasing a deposit check delays your material order and pushes your start date.

Managing 10+ open estimates across different trades and customers is a full-time job in itself.

How it works

From walkthrough to deposit in a single afternoon.

1

Build your estimate

Add line items, set your deposit percentage, and drop in your standard terms. Takes about 3 minutes.

2

Send the link

One click generates a mobile-friendly approval page. Text it, email it, or paste it into a chat — whatever your customer reads.

3

Get approved & paid

Customer reviews the scope, types their name as a legal signature, and pays the deposit via Stripe — all in one flow.

A typical general contracting estimate

Drop these line items straight into a new estimate. Adjust quantities and prices for the specific job.

Join the waitlist →
Line itemWhen to use it
Project management / general conditionsSupervision, coordination, site safety, portable facilities.
Demo and haul-awayPer room or per cubic yard; includes dumpster if needed.
Framing labor (per sq ft or per hour)New walls, headers, structural modifications.
Drywall — supply and install (per sq ft)Includes tape, mud, and primer coat.
Flooring — LVP install (per sq ft)Labor only; material quoted separately per selection.
Electrical — rough and finish (allowance)Subcontractor pass-through at cost + 15%.
Plumbing — rough and finish (allowance)Subcontractor pass-through at cost + 15%.
Paint — walls, trim, ceilings2-coat finish; customer color selection.
Contingency (10%)Covers unforeseen conditions; unused portion credited at close.

Built for how general contractors actually work

1

Every job in one dashboard

Every estimate, change order, and approval lives in one place. Know the status of every job without opening a spreadsheet.

2

Subcontractor allowances built in

Pass through sub costs with your markup as line items. The customer sees the total; the breakdown stays yours.

3

Signed change orders for every scope addition

Hidden conditions, owner requests, material substitutions — each change order is its own signed approval.

I run 6-8 jobs at a time. Riveta lets me track every estimate, every approval, and every deposit in one place without a spreadsheet.
General contractor, Portland OR

Frequently asked questions

Can I manage multiple jobs and estimates at once?

Yes. Your dashboard shows all estimates with status, total, and customer — filtered by draft, sent, approved, and declined.

How do I handle subcontractor allowances?

Add them as line items with your markup. The customer sees the total; you control the detail.

What about change orders?

Create a change order linked to the original estimate. Same link-based approval flow — customer signs separately for each scope change.

Can I add my logo and business info?

Yes — set your logo, business name, phone, and default terms in Settings. They appear on every estimate automatically.

Other trades we serve

Send a general contracting estimate today.

Free account in under a minute. Send a public approval link by email or text — your customer signs and pays a deposit right from their phone.