Skip to main content

For roofers

Roofing estimates approved before the next storm hits

Send a professional estimate link from the truck. Customer reviews, signs, and pays a deposit in minutes — so you can order materials with confidence.

No credit card required.

4 hrs
Median time to signed approval on a full reroof quote
37%
Of roofing quotes lost while customers 'think about it'
1 link
Customer approves, signs, and pays deposit in one flow

What slows roofers down today

You climb the roof, write up a detailed estimate, and the homeowner goes quiet for two weeks comparing quotes.

Materials cost you upfront but deposits don't come in until the job starts — if it starts.

Insurance claims and adjuster negotiations create multi-version estimate chaos.

Verbal approval on a big reroof turns into a payment dispute when the invoice arrives.

How it works

From walkthrough to deposit in a single afternoon.

1

Build your estimate

Add line items, set your deposit percentage, and drop in your standard terms. Takes about 3 minutes.

2

Send the link

One click generates a mobile-friendly approval page. Text it, email it, or paste it into a chat — whatever your customer reads.

3

Get approved & paid

Customer reviews the scope, types their name as a legal signature, and pays the deposit via Stripe — all in one flow.

A typical roofing estimate

Drop these line items straight into a new estimate. Adjust quantities and prices for the specific job.

Join the waitlist →
Line itemWhen to use it
Roof inspection / diagnosticInitial assessment, photos, and scope writeup.
Tear-off — 1 layer asphalt shingles (per square)Includes haul-away of all debris.
Decking repair — OSB (per sheet)Replace damaged or rotted sheathing as discovered.
Ice & water shield (per square)Applied per local code at eaves and valleys.
Synthetic underlayment (per square)30# synthetic over entire deck surface.
Architectural shingles — 30-year (per square)Customer color selection; manufacturer warranty included.
Flashing — step, counter, and pipe bootsAll penetrations waterproofed per code.
Ridge cap and ventilationContinuous ridge vent and cap shingles.
PermitPass-through at actual cost.

Built for how roofers actually work

1

Insurance supplement ready

Each revised estimate is its own link with a clean version history. Send updated scopes as the adjuster negotiates — every version timestamped and customer-approved.

2

Materials ordered on signed approvals only

Shingles on the truck before you have a signed approval is a recipe for disputes. Collect the deposit the moment they sign — then order with confidence.

3

Roof inspection photos attached

Upload your inspection photos directly to the estimate. The customer approves knowing exactly what you found.

Roofing customers always want to think about it. Now I send the link before I back out of the driveway — half the time they've approved it before I get home.
Roofing contractor, Nashville TN

Frequently asked questions

Can I handle insurance supplement estimates?

Yes. You can add line items for supplements and send an updated estimate link. Each version is a separate estimate.

What if the scope changes mid-job?

Send a change order with the additional scope. It goes through the same approval and signature flow as the original estimate.

Can customers pay a deposit online?

Yes — Stripe Checkout is embedded in the approval page. They can pay by card, Apple Pay, or Google Pay.

Do you support large commercial estimates?

There's no cap on estimate size or number of line items. Commercial jobs work the same as residential.

Other trades we serve

Send a roofing estimate today.

Free account in under a minute. Send a public approval link by email or text — your customer signs and pays a deposit right from their phone.